Extension of Southern Expressway (ESE) SriLanka

Project Info

  • Category

    Engineering Design

Want create site? Find Free WordPress Themes and plugins.

This is the extension of Colombo – Matara expressway to Hambantota. Total length of the section is 30 km and going to be completed in two stages. Initial stage is 4 traffic lanes and the ultimate stage is 6 traffic lanes which has width of 3m and 30.5m respectively. This project is funded by EXIM bank and the main contractor is China National Aero-Technology Import & Export Corporation (CATIC), China. Total project cost is 860 USD million.

AVEK is responsible for the structural design of 9 km long viaducts, underpass bridges, overpass bridges, underpass culverts and box culverts, including the designs of pile foundations and 6 span continuous and simple supported ‘T’ girders. The design has been carried out for Engineering Design and Project Management Consultants (Pvt) Ltd, the main designer of the project.

Did you find apk for android? You can find new Free Android Games and apps.